Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
769
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0340 # 05 Y:2007 | 05 | 2007 | Cooling Towers | $14,070 | $3,000 | Not Implemented |
SF0340 # 06 Y:2007 | 06 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,921 | $1,133 | Not Implemented |
SF0340 # 07 Y:2007 | 07 | 2007 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $12,710 | $4,246 | Not Implemented |
SF0340 # 08 Y:2007 | 08 | 2007 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $4,828 | $1,892 | Implemented |
SF0340 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,910 | $12,188 | Not Implemented |
SF0340 # 10 Y:2007 | 10 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $125,591 | $80,000 | Not Implemented |
SF0340 # 11 Y:2007 | 11 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,896 | $15,000 | Not Implemented |
SF0340 # 12 Y:2007 | 12 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,702 | $15,428 | Implemented |
SF0340 # 13 Y:2007 | 13 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,410 | $3,712 | Implemented |
SF0340 # 14 Y:2007 | 14 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $70,597 | $65,970 | Not Implemented |
SF0340 # 15 Y:2007 | 15 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,697 | $37,793 | Implemented |
SF0340 # 16 Y:2007 | 16 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,354 | $70,400 | Implemented |
SF0340 # 17 Y:2007 | 17 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,135 | $6,224 | Not Implemented |
SF0340 # 18 Y:2007 | 18 | 2007 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,904 | $16,738 | Not Implemented |
UF0397 # 01 Y:2007 | 01 | 2007 | INSTALL SET-BACK TIMERS | $504 | $144 | Implemented |
UF0397 # 02 Y:2007 | 02 | 2007 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $5,429 | $12,800 | Implemented |
UF0397 # 03 Y:2007 | 03 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,655 | $1,826 | Not Implemented |
UF0397 # 04 Y:2007 | 04 | 2007 | REDESIGN PROCESS | $10,558 | $8,150 | Not Implemented |
UF0397 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,391 | $590 | Implemented |
UF0397 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $189 | $0 | Implemented |
UF0397 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,305 | $6,526 | Implemented |
UF0397 # 08 Y:2007 | 08 | 2007 | INSTALL OCCUPANCY SENSORS | $1,504 | $894 | Not Implemented |
UF0397 # 09 Y:2007 | 09 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $945 | $1,521 | Not Implemented |
SF0337 # 01 Y:2007 | 01 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,667 | $0 | Implemented |
SF0337 # 02 Y:2007 | 02 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $50,318 | $20,000 | Not Implemented |