IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

769

matching recommendations
Reset
NAICS 325412 Pharmaceutical Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0337 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $1,729 $937 Implemented
SF0337 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $3,650 $3,344 Implemented
SF0337 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,534 $3,510 Implemented
SF0337 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,179 $3,376 Implemented
SF0337 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $929 $3,460 Not Implemented
SF0336 # 01 Y:2006 01 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16 $0 Implemented
SF0336 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $202 $0 Implemented
SF0336 # 03 Y:2006 03 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $882 $24,000 Not Implemented
SF0336 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,827 $5,934 Not Implemented
SF0336 # 05 Y:2006 05 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,164 $15,000 Not Implemented
SF0336 # 06 Y:2006 06 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31 $29,700 Not Implemented
SF0336 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $4,374 Not Implemented
SF0336 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $872 $2,849 Not Implemented
SF0336 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2 $7,040 Implemented
SF0336 # 10 Y:2006 10 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $234 $557 Implemented
SF0336 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $955 $2,480 Implemented
SF0336 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,076 $16,625 Implemented
SF0336 # 13 Y:2006 13 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $327 $6,381 Implemented
LE0237 # 01 Y:2006 01 2006 REDESIGN PROCESS $149,763 $12,500 Not Implemented
LE0237 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $89,692 $7,500 Not Implemented
LE0237 # 03 Y:2006 03 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $64,774 $2,000 Implemented
LE0237 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,057 $1,000 Implemented
LE0237 # 05 Y:2006 05 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $3,961 $200 Not Implemented
LE0237 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,658 $3,000 Not Implemented
LE0237 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $3,162 $900 Implemented