Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0579 # 01 Y:2025 | 01 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21 | $0 | n/a |
SU0579 # 02 Y:2025 | 02 | 2025 | DISCONNECT BALLASTS | $94 | $0 | n/a |
SU0579 # 03 Y:2025 | 03 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $530 | $0 | n/a |
SU0579 # 04 Y:2025 | 04 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,944 | $0 | n/a |
SU0579 # 05 Y:2025 | 05 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $9,467 | $65 | n/a |
SU0579 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $808 | $43 | n/a |
SU0579 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $153 | $203 | n/a |
SU0579 # 08 Y:2025 | 08 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $80 | $188 | n/a |
SU0579 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28 | $100 | n/a |
SU0579 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $107 | $598 | n/a |
SU0579 # 11 Y:2025 | 11 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,615 | $31,920 | n/a |
UF0629 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $214 | $342 | n/a |
UF0629 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,690 | $322,608 | n/a |
UF0629 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,163 | $14,913 | n/a |
UF0629 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,977 | $47,000 | n/a |
UF0629 # 04 Y:2025 | 04 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,306 | $25,400 | n/a |
UF0629 # 05 Y:2025 | 05 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,706 | $754 | n/a |
UF0629 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,163 | $0 | n/a |
UF0629 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,103 | $455 | n/a |
UF0627 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,402 | $72,000 | n/a |
UF0627 # 08 Y:2025 | 08 | 2025 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $41,600 | $98,000 | n/a |
UF0627 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,019 | $2,949 | n/a |
UF0627 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,094 | $2,000 | n/a |
UF0627 # 05 Y:2025 | 05 | 2025 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $3,491 | $0 | n/a |
UF0627 # 04 Y:2025 | 04 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,567 | $9,248 | n/a |