Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
683
matching recommendationsNAICS | 3255 | Paint, Coating, and Adhesive Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0361 # 08 Y:2007 | 08 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $452 | $500 | Implemented |
NC0361 # 09 Y:2007 | 09 | 2007 | KEEP BOILER TUBES CLEAN | $1,550 | $2,395 | Not Implemented |
NC0361 # 10 Y:2007 | 10 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $553 | $0 | Not Implemented |
NC0361 # 11 Y:2007 | 11 | 2007 | INCREASE AMOUNT OF CONDENSATE RETURNED | $376 | $1,000 | Not Implemented |
MI0124 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,063 | $40,180 | n/a |
MI0124 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,719 | $2,400 | n/a |
MI0124 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,540 | $28 | n/a |
MI0124 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $950 | $1,018 | n/a |
MI0124 # 05 Y:2006 | 05 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,268 | $31,176 | n/a |
WV0327 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $11,686 | $2,140 | Implemented |
WV0327 # 02 Y:2005 | 02 | 2005 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $9,890 | $3,960 | Not Implemented |
WV0327 # 03 Y:2005 | 03 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,323 | $3,960 | Implemented |
WV0327 # 04 Y:2005 | 04 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,759 | $1,000 | Implemented |
WV0327 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,613 | $2,644 | Not Implemented |
WV0327 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,057 | $696 | Implemented |
WV0327 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $476 | $632 | Not Implemented |
WV0327 # 08 Y:2005 | 08 | 2005 | USE SYNTHETIC LUBRICANT | $415 | $24 | Implemented |
WV0327 # 09 Y:2005 | 09 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $388 | $176 | Implemented |
WV0327 # 10 Y:2005 | 10 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $342 | $60 | Implemented |
WV0327 # 11 Y:2005 | 11 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $301 | $135 | Not Implemented |
WV0327 # 12 Y:2005 | 12 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $246 | $0 | Implemented |
WV0327 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $224 | $120 | Implemented |
WV0327 # 14 Y:2005 | 14 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,365 | $96 | Implemented |
AM0496 # 01 Y:2005 | 01 | 2005 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $35,000 | $102,400 | Not Implemented |
AM0496 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $6,400 | $8,050 | Implemented |