IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

651

matching recommendations
Reset
NAICS 3255 Paint, Coating, and Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0579 # 10 Y:2019 10 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $346 $33 Implemented
WV0579 # 09 Y:2019 09 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $589 $1,000 Implemented
WV0579 # 08 Y:2019 08 2019 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $889 $1,460 Not Implemented
WV0579 # 07 Y:2019 07 2019 UPGRADE CONTROLS ON COMPRESSORS $1,120 $5,000 Not Implemented
WV0579 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,976 $11,825 Not Implemented
WV0579 # 05 Y:2019 05 2019 DEVELOP A REPAIR/REPLACE POLICY $4,488 $879 Implemented
WV0579 # 04 Y:2019 04 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,774 $22,038 Not Implemented
WV0579 # 01 Y:2019 01 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $95,486 $76,000 Not Implemented
WV0579 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,379 $3,500 Implemented
WV0579 # 03 Y:2019 03 2019 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $14,452 $10,325 Not Implemented
MZ0258 # 07 Y:2018 07 2018 USE OPTIMUM THICKNESS INSULATION $4,597 $2,989 Not Implemented
MZ0258 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,344 $1,800 Implemented
MZ0258 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,199 $420 Not Implemented
MZ0258 # 04 Y:2018 04 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,728 $3,200 Implemented
MZ0258 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,883 $6,200 Not Implemented
MZ0258 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,450 $5,000 Implemented
MZ0258 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $19,136 $1,400 Not Implemented
NC0617 # 06 Y:2018 06 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,162 $50,000 Implemented
NC0617 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $300 $1,250 Not Implemented
NC0617 # 04 Y:2018 04 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,137 $12,000 Implemented
NC0617 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $352 $90 Implemented
NC0617 # 02 Y:2018 02 2018 USE PHOTOCELL CONTROLS $1,341 $450 Implemented
NC0617 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,647 $16,472 Implemented
MI0334 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,234 $12,519 Not Implemented
MI0334 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,575 $13,838 Implemented