IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

651

matching recommendations
Reset
NAICS 3255 Paint, Coating, and Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0097 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,602 $25 Implemented
IP0097 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,685 $275 Implemented
IP0097 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,492 $600 Implemented
IP0097 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $7,330 $4,122 Not Implemented
IP0097 # 05 Y:2018 05 2018 APPLY FOR INVESTMENT INCENTIVES $161 $100 Implemented
IP0097 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $183 $639 Not Implemented
IP0097 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,259 $15,632 Implemented
IP0097 # 08 Y:2018 08 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,428 $6,125 Not Implemented
IP0097 # 09 Y:2018 09 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,786 $1,576 Not Implemented
OK0978 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,821 $27,209 Implemented
OK0978 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,046 $1,446 Implemented
OK0978 # 10 Y:2017 10 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $19,215 $0 Not Implemented
OK0978 # 11 Y:2017 11 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,391 $3,600 Not Implemented
OK0978 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $18,551 $40,582 Not Implemented
OK0978 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,546 $20,000 Not Implemented
OK0978 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,233 $2,000 Implemented
OK0978 # 04 Y:2017 04 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $988 $4,800 Not Implemented
OK0978 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,833 $2,777 Not Implemented
OK0978 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,519 $410 Not Implemented
OK0978 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,821 $74,753 Not Implemented
MI0312 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,284 $33,139 Implemented
MI0312 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $11,092 $31,500 Not Implemented
MI0312 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $9,806 $3,600 Implemented
MI0312 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $9,922 $1,995 Implemented
MI0312 # 05 Y:2017 05 2017 USE PHOTOCELL CONTROLS $9,752 $8,000 Implemented