IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

651

matching recommendations
Reset
NAICS 3255 Paint, Coating, and Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0084 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,665 $0 Implemented
WM0084 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,605 $1,900 Implemented
WM0084 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,145 $0 Not Implemented
WM0084 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $17,305 $34,684 Not Implemented
WM0084 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,124 $83,912 Implemented
WM0084 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,763 $15,500 Not Implemented
WV0521 # 09 Y:2016 09 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $408 $728 Not Implemented
WV0521 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $718 $500 Implemented
WV0521 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $728 $443 Implemented
WV0521 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $1,612 $3,592 Not Implemented
WV0521 # 05 Y:2016 05 2016 DEVELOP A REPAIR/REPLACE POLICY $2,423 $1,224 Not Implemented
WV0521 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,142 $152 Implemented
WV0521 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,543 $2,714 Not Implemented
WV0521 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $10,186 $8,000 Implemented
WV0521 # 01 Y:2016 01 2016 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,401 $25,760 Not Implemented
LE0409 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $591 $0 Implemented
LE0409 # 02 Y:2016 02 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,416 $2,000 Implemented
LE0409 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,598 $5,700 Implemented
LE0409 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,605 $43,760 Not Implemented
LE0409 # 05 Y:2016 05 2016 USE RADIANT HEATER FOR SPOT HEATING $6,148 $21,000 Implemented
LE0409 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $45,635 $252,000 Not Implemented
SF0475 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,033 $0 Implemented
SF0475 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,039 $0 Implemented
SF0475 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $2,990 $822 Implemented
SF0475 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $1,340 Implemented