Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 3255 | Paint, Coating, and Adhesive Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2418 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,575 | $15,491 | n/a |
UC2418 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $964 | $30 | n/a |
UC2418 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,058 | $0 | n/a |
UC2418 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,122 | $100 | n/a |
UC2418 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,270 | $240,764 | n/a |
UC2418 # 04 Y:2024 | 04 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,473 | $61,975 | n/a |
UL2416 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $20,797 | $16,250 | n/a |
UL2416 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $139 | $469 | n/a |
UL2416 # 12 Y:2024 | 12 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,386 | $1,600 | n/a |
UL2416 # 13 Y:2024 | 13 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,610 | $190,384 | n/a |
UL2416 # 11 Y:2024 | 11 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $9,389 | $10,000 | n/a |
UL2416 # 10 Y:2024 | 10 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,389 | $25,000 | n/a |
UL2416 # 06 Y:2024 | 06 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $23,980 | $43,234 | n/a |
UL2416 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $565 | $273 | n/a |
UL2416 # 07 Y:2024 | 07 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $743 | $660 | n/a |
UL2416 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,542 | $1,170 | n/a |
UL2416 # 03 Y:2024 | 03 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $276 | $0 | n/a |
UL2416 # 05 Y:2024 | 05 | 2024 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $4,975 | $8,000 | n/a |
UL2416 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,134 | $330 | n/a |
WM0225 # 01 Y:2024 | 01 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $43,885 | $200,000 | n/a |
WM0225 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,176 | $0 | n/a |
WM0225 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,067 | $5,244 | n/a |
WM0225 # 04 Y:2024 | 04 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,687 | $4,037 | n/a |
WM0225 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,246 | $1,375 | n/a |
UD1089 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $79,860 | $0 | Not Implemented |