IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 32552 Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0135 # 12 Y:2020 12 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,916 $6,013 Implemented
IP0135 # 09 Y:2020 09 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,937 $3,800 Implemented
IP0135 # 07 Y:2020 07 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $957 $588 Implemented
IP0135 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,626 $1,418 Implemented
IP0135 # 05 Y:2020 05 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,568 $390 Implemented
IP0135 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $317 $0 Implemented
IP0135 # 01 Y:2020 01 2020 COMBINE UTILITY METERS $2,157 $0 Implemented
IP0098 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,174 $612 Implemented
IP0098 # 09 Y:2018 09 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $229 $1,000 Implemented
IP0098 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $2,108 Implemented
IP0098 # 07 Y:2018 07 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $540 $1,000 Implemented
IP0098 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,177 $1,367 Implemented
IP0098 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,663 $115 Implemented
IP0098 # 02 Y:2018 02 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,416 $130 Implemented
IP0098 # 01 Y:2018 01 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,587 $0 Implemented
IP0097 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,259 $15,632 Implemented
IP0097 # 05 Y:2018 05 2018 APPLY FOR INVESTMENT INCENTIVES $161 $100 Implemented
IP0097 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,492 $600 Implemented
IP0097 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,685 $275 Implemented
IP0097 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,602 $25 Implemented
IP0078 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $820 $4 Implemented
IP0078 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,354 $3,396 Implemented
IP0078 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,032 $21 Implemented