IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 32552 Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2416 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $565 $273 n/a
UL2416 # 13 Y:2024 13 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $19,610 $190,384 n/a
UL2416 # 12 Y:2024 12 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,386 $1,600 n/a
UL2416 # 11 Y:2024 11 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,389 $10,000 n/a
UL2416 # 10 Y:2024 10 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,389 $25,000 n/a
UL2416 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,542 $1,170 n/a
UL2416 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,134 $330 n/a
UL2416 # 07 Y:2024 07 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $743 $660 n/a
UL2416 # 06 Y:2024 06 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $23,980 $43,234 n/a
UL2416 # 05 Y:2024 05 2024 LOWER CEILING TO REDUCE CONDITIONED SPACE $4,975 $8,000 n/a
UL2416 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $139 $469 n/a
UL2416 # 03 Y:2024 03 2024 INSTALL SPECTRAL REFLECTORS / DELAMP $276 $0 n/a
UL2416 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $20,797 $16,250 n/a
UK1613 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,528 $35,000 Not Implemented
UK1613 # 10 Y:2017 10 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $145 $0 Implemented
UK1613 # 09 Y:2017 09 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $478 $756 Implemented
UK1613 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $535 $0 Implemented
UK1613 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $0 Implemented
UK1613 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,264 $1,200 Implemented
UK1613 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $3,544 $1,386 Not Implemented
UK1613 # 04 Y:2017 04 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,332 $4,602 Not Implemented
UK1613 # 03 Y:2017 03 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,962 $4,550 Not Implemented
UK1613 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,671 $0 Implemented