Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 32552 | Adhesive Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1027 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,486 | $1,000 | Not Implemented |
UD1027 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,612 | $0 | Implemented |
UD1027 # 10 Y:2021 | 10 | 2021 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $10,735 | $43,000 | Not Implemented |
UD1027 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,013 | $65,250 | Implemented |
UD1027 # 08 Y:2021 | 08 | 2021 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $2,481 | $4,300 | Not Implemented |
UD1027 # 07 Y:2021 | 07 | 2021 | REPAIR OR REPLACE STEAM TRAPS | $6,067 | $4,875 | Not Implemented |
UD1027 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,443 | $0 | Not Implemented |
UD1027 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,842 | $1,000 | Implemented |
UD1027 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,522 | $0 | Not Implemented |
UD1027 # 03 Y:2021 | 03 | 2021 | RECOVER AND REUSE COOLING WATER | $7,993 | $0 | Not Implemented |
WV0521 # 05 Y:2016 | 05 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $2,423 | $1,224 | Not Implemented |
WV0521 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,142 | $152 | Implemented |
WV0521 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,543 | $2,714 | Not Implemented |
WV0521 # 02 Y:2016 | 02 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $10,186 | $8,000 | Implemented |
WV0521 # 01 Y:2016 | 01 | 2016 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $26,401 | $25,760 | Not Implemented |
WV0521 # 06 Y:2016 | 06 | 2016 | INSULATE BARE EQUIPMENT | $1,612 | $3,592 | Not Implemented |
WV0521 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $728 | $443 | Implemented |
WV0521 # 08 Y:2016 | 08 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $718 | $500 | Implemented |
WV0521 # 09 Y:2016 | 09 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $408 | $728 | Not Implemented |
WV0416 # 08 Y:2010 | 08 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $3,797 | $830 | Implemented |
WV0416 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,776 | $1,360 | Implemented |
WV0416 # 05 Y:2010 | 05 | 2010 | USE SYNTHETIC LUBRICANT | $7,111 | $2,160 | Not Implemented |
WV0416 # 04 Y:2010 | 04 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,114 | $22,200 | Not Implemented |
WV0416 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,288 | $2,374 | Not Implemented |
WV0416 # 02 Y:2010 | 02 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,496 | $2,500 | Implemented |