IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

570

matching recommendations
Reset
NAICS 3256 Soap, Cleaning Compound, and Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0273 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,069 $12,540 Not Implemented
MS0273 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,056 $26,912 Not Implemented
MS0273 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $7,498 $89 Implemented
MS0273 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,737 $685 Not Implemented
MS0273 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,326 $19,601 Not Implemented
MS0273 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,219 $1,480 Not Implemented
MS0273 # 07 Y:2005 07 2005 PAY UTILITY BILLS ON TIME $3,704 $0 Implemented
MS0273 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,474 $203 Not Implemented
MS0273 # 09 Y:2005 09 2005 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,353 $231 Not Implemented
MS0273 # 10 Y:2005 10 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,338 $1,215 Not Implemented
MS0273 # 11 Y:2005 11 2005 AIR CONDITION ONLY SPACE NECESSARY $891 $240 Not Implemented
MS0273 # 12 Y:2005 12 2005 INSTALL TIMERS AND/OR THERMOSTATS $261 $204 Implemented
GT0793 # 01 Y:2004 01 2004 COMBINE UTILITY METERS $5,142 $8,000 Not Implemented
GT0793 # 02 Y:2004 02 2004 USE SYNTHETIC LUBRICANT $2,500 $0 Not Implemented
GT0793 # 03 Y:2004 03 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,040 $0 Not Implemented
GT0793 # 04 Y:2004 04 2004 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $270 $758 Not Implemented
GT0793 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,280 $2 Not Implemented
GT0793 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $1,850 Not Implemented
GT0793 # 07 Y:2004 07 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,890 $8,000 Not Implemented
GT0793 # 08 Y:2004 08 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,000 $9,090 Not Implemented
SD0343 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,576 $440 Not Implemented
SD0343 # 02 Y:2004 02 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $15,314 $46,898 Not Implemented
SD0343 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,381 $2,113 Not Implemented
SD0343 # 04 Y:2004 04 2004 USE EVAPORATION TO CONCENTRATE MATERIAL $11,520 $12,000 Not Implemented
SD0343 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,692 $18,500 Not Implemented