IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 32561 Soap and Cleaning Compound Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0383 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,548 $480 Not Implemented
MI0383 # 01 Y:2020 01 2020 USE SOLAR HEAT TO HEAT WATER $10,293 $12,280 Implemented
MI0383 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $552 $882 Implemented
MI0383 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,327 $2,436 Implemented
MI0383 # 04 Y:2020 04 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,698 $1,306 Implemented
MI0383 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,976 $1,428 Implemented
MI0380 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,433 $12,201 Implemented
MI0380 # 08 Y:2020 08 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $421 $1,231 Not Implemented
MI0380 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $568 $120 Implemented
MI0380 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,175 $1,980 Implemented
MI0380 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,277 $853 Not Implemented
MI0380 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $2,753 $3,280 Implemented
MI0380 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $11,460 Implemented
MI0380 # 01 Y:2020 01 2020 USE SOLAR HEAT TO HEAT WATER $17,031 $8,409 Implemented
TR0025 # 04 Y:2020 04 2020 REPAIR AND ELIMINATE STEAM LEAKS $1,683 $130 Implemented
TR0025 # 01 Y:2020 01 2020 INSULATE BARE EQUIPMENT $657 $440 Implemented
TR0025 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,326 $1,145 Implemented
TR0025 # 03 Y:2020 03 2020 USE OPTIMUM THICKNESS INSULATION $1,067 $830 Implemented
TR0025 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $371 $676 Implemented
TR0025 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,497 $9,060 Implemented
AS0479 # 06 Y:2020 06 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,794 $7,400 Implemented
AS0479 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,834 $330 Implemented
AS0479 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,979 $1,639 Implemented
AS0479 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,108 $6,016 Implemented
AS0479 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $15,892 $111,826 Not Implemented