IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 325613 Surface Active Agent Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0498 # 03 Y:2021 03 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $5,147 $9,248 Not Implemented
LE0498 # 02 Y:2021 02 2021 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $226 $50 Not Implemented
LE0498 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,052 $0 Not Implemented
LE0498 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,427 $3,800 Not Implemented
LE0498 # 05 Y:2021 05 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,592 $40,000 Not Implemented
LE0498 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,503 $7,000 Not Implemented
CL1910 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $2,189 $2,205 Implemented
CL1910 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,560 $23,063 Implemented
CL1910 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,387 $1,900 Implemented
CL1910 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $377 $1,605 Implemented
IC0185 # 01 Y:2011 01 2011 REPAIR AND ELIMINATE STEAM LEAKS $1,075 $200 Not Implemented
IC0185 # 07 Y:2011 07 2011 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $260,354 $102,100 n/a
IC0185 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $205 $334 n/a
IC0185 # 05 Y:2011 05 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,057 $115 n/a
IC0185 # 04 Y:2011 04 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $283 $1 n/a
IC0185 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $604 $1,719 n/a
IC0185 # 02 Y:2011 02 2011 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $66,621 $315,096 n/a
UD0832 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,977 $1,063 Implemented
UD0832 # 08 Y:2011 08 2011 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,424 $500 Implemented
UD0832 # 06 Y:2011 06 2011 UPGRADE OBSOLETE EQUIPMENT $4,243 $4,728 Implemented
UD0832 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,419 $39,141 Implemented
UD0832 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $500 Implemented
UD0832 # 12 Y:2011 12 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,554 $5,000 Not Implemented
UD0832 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,473 $16,265 Not Implemented
UD0832 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,751 $40,000 Implemented