IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

225

matching recommendations
Reset
NAICS 32562 Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0435 # 08 Y:2023 08 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $4,360 $3,208 n/a
MI0432 # 08 Y:2023 08 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $678 $490 Not Implemented
MI0432 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $7,559 $3,360 Implemented
MI0432 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $682 $1,953 Implemented
MI0432 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $276 $1,150 Not Implemented
MI0432 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,952 $120 Not Implemented
MI0432 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,587 $1,360 Not Implemented
MI0432 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,607 $580 Not Implemented
MI0432 # 03 Y:2023 03 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,131 $6,528 Implemented
MI0432 # 04 Y:2023 04 2023 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,728 $1,750 Not Implemented
UU0230 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,121 $33,692 Not Implemented
UU0230 # 10 Y:2023 10 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,460 $1,000 Implemented
UU0230 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,277 $2,970 Implemented
UU0230 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $32,123 $20,174 Implemented
UU0230 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $4,607 $4,819 Implemented
UU0230 # 09 Y:2023 09 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,682 $2,000 Not Implemented
UU0230 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,861 $1,200 Implemented
UU0230 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,818 $12,930 Implemented
UU0230 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,018 $26,647 Implemented
UU0230 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,790 $1,000 Implemented
UU0230 # 06 Y:2023 06 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,985 $11,730 Not Implemented
UF0598 # 10 Y:2023 10 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,588 $2,800 Implemented
UF0598 # 11 Y:2023 11 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,193 $15,120 Not Implemented
UF0598 # 09 Y:2023 09 2023 INSTALL TURBULATORS $6,732 $7,500 Implemented
UF0598 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,906 $25,280 Not Implemented