IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 32562 Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0127 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $0 $0 Not Implemented
MZ0127 # 08 Y:2013 08 2013 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $55,500 $650,000 Not Implemented
MZ0127 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,278 $4,500 Implemented
MZ0127 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,597 $8,000 Implemented
MZ0127 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,595 $0 Not Implemented
MZ0127 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,446 $1,300 Implemented
MZ0127 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,890 $57,890 Not Implemented
MZ0127 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $13,741 $16,000 Implemented
MZ0127 # 13 Y:2013 13 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $22,766 $60,580 Not Implemented
MZ0127 # 01 Y:2013 01 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $0 $0 Implemented
MZ0127 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,000 $0 Implemented
MZ0127 # 11 Y:2013 11 2013 REPAIR OR REPLACE STEAM TRAPS $12,000 $0 Implemented
MZ0127 # 12 Y:2013 12 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,737 $28,800 Implemented
BS0015 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $105 $140 Not Implemented
BS0015 # 08 Y:2013 08 2013 MINIMIZE WATER USAGE $151 $59 Implemented
BS0015 # 07 Y:2013 07 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $93 $1,073 Not Implemented
BS0015 # 06 Y:2013 06 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $127 $747 Not Implemented
BS0015 # 05 Y:2013 05 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $607 $990 Implemented
BS0015 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $211 $979 Implemented
BS0015 # 03 Y:2013 03 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $165 $50 Not Implemented
BS0015 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $241 Not Implemented
MI0234 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,103 $80 Implemented
MI0234 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,067 $2,520 Implemented
MI0234 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,115 $8,409 Implemented
MI0234 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,377 $1,660 Implemented