Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 325620 | Toilet Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0432 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,559 | $3,360 | Implemented |
MI0432 # 03 Y:2023 | 03 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,131 | $6,528 | Implemented |
MI0432 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $682 | $1,953 | Implemented |
UF0598 # 10 Y:2023 | 10 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,588 | $2,800 | Implemented |
UF0598 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $6,732 | $7,500 | Implemented |
UF0598 # 08 Y:2023 | 08 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $8,114 | $0 | Implemented |
UF0598 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,338 | $432 | Implemented |
UF0598 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,556 | $22,000 | Implemented |
UF0598 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,433 | $14,328 | Implemented |
UF0598 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $30,832 | $8,310 | Implemented |
UF0598 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $61,221 | $34,460 | Implemented |
MI0397 # 05 Y:2021 | 05 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,631 | $40 | Implemented |
MI0397 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,361 | $40 | Implemented |
MI0234 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,388 | $80 | Implemented |
MI0234 # 08 Y:2013 | 08 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $252 | $447 | Implemented |
MI0234 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,103 | $80 | Implemented |
MI0234 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,067 | $2,520 | Implemented |
MI0234 # 04 Y:2013 | 04 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,115 | $8,409 | Implemented |
MI0234 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,377 | $1,660 | Implemented |
MI0234 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,035 | $2,600 | Implemented |
UF0370 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $4,053 | $1,317 | Implemented |
UF0370 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $47,299 | $130,000 | Implemented |
UF0370 # 11 Y:2005 | 11 | 2005 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,313 | $0 | Implemented |
UF0370 # 03 Y:2005 | 03 | 2005 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $20,435 | $56,000 | Implemented |
UF0370 # 01 Y:2005 | 01 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,736 | $1,212 | Implemented |