IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

923

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0548 # 03 Y:2017 03 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,317 $7,500 Not Implemented
SD0548 # 04 Y:2017 04 2017 DISCONNECT BALLASTS $4,196 $2,050 Implemented
SD0548 # 05 Y:2017 05 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $3,756 $9,629 Not Implemented
SD0548 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $2,573 $5,317 Implemented
SD0548 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,113 $1,500 Implemented
SD0548 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,052 $360 Implemented
WV0537 # 01 Y:2017 01 2017 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $86,765 $200,500 Not Implemented
WV0537 # 02 Y:2017 02 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $18,040 $80,000 Not Implemented
WV0537 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,952 $7,891 Implemented
WV0537 # 04 Y:2017 04 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,934 $1,200 Implemented
WV0537 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,210 $0 Implemented
WV0537 # 06 Y:2017 06 2017 UPGRADE CONTROLS ON COMPRESSORS $6,093 $6,000 Not Implemented
WV0537 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,987 $3,105 Implemented
WV0537 # 08 Y:2017 08 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,323 $2,700 Not Implemented
WV0537 # 09 Y:2017 09 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,291 $25 Implemented
WV0537 # 10 Y:2017 10 2017 INSULATE BARE EQUIPMENT $1,909 $943 Implemented
WV0537 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,706 $678 Implemented
WV0537 # 12 Y:2017 12 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $1,686 $700 Not Implemented
WV0537 # 13 Y:2017 13 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,149 $4,400 Implemented
WV0537 # 14 Y:2017 14 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $992 $631 Implemented
MA0754 # 01 Y:2016 01 2016 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,595,248 $5,445,000 Not Implemented
MA0754 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $112,215 $1,000 Not Implemented
MA0754 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,309 $500,000 Not Implemented
MA0754 # 04 Y:2016 04 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $62,104 $250,000 Not Implemented
MA0754 # 05 Y:2016 05 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,769 $3,000 Implemented