IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

923

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0448 # 04 Y:2012 04 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,243 $14,500 Not Implemented
WV0448 # 03 Y:2012 03 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,859 $16,925 Not Implemented
WV0448 # 02 Y:2012 02 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,053 $51,600 Not Implemented
WV0448 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,725 $9,258 Implemented
MZ0076 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,188 $9,000 Not Implemented
MZ0076 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,620 $150 Not Implemented
MZ0076 # 03 Y:2012 03 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,645 $27,000 Not Implemented
MZ0076 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $8,058 $2,310 Not Implemented
MZ0076 # 05 Y:2012 05 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $36,400 $2,270 Not Implemented
UF0451 # 01 Y:2011 01 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,739 $0 Implemented
UF0451 # 02 Y:2011 02 2011 INSTALL COMMON HEADER ON COMPRESSORS $8,773 $222 Implemented
UF0451 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,497 $0 Not Implemented
UF0451 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $1,277 Implemented
UF0451 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,440 $3,310 Implemented
UF0451 # 06 Y:2011 06 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $498 $0 Implemented
UF0451 # 07 Y:2011 07 2011 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $1,379 $1,140 Not Implemented
UF0451 # 08 Y:2011 08 2011 USE OPTIMUM THICKNESS INSULATION $1,327 $1,865 Not Implemented
MA0681 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $6,162 $9,261 Implemented
MA0681 # 02 Y:2011 02 2011 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,294 $1,220 Not Implemented
MA0681 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,163 $1,265 Implemented
MA0681 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $768 $300 Not Implemented
MA0681 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $152 $80 Not Implemented
TT0080 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,663 $100 Implemented
TT0080 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,837 $7,143 Not Implemented
TT0080 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $546 $977 Not Implemented