IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

923

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0417 # 06 Y:2010 06 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,780 $4,485 Not Implemented
WV0417 # 07 Y:2010 07 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,311 $7,750 Not Implemented
WV0417 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,656 $1,188 Implemented
WV0417 # 09 Y:2010 09 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,334 $1,500 Implemented
WV0417 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $976 $1,290 Not Implemented
LL0332 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,186 $1,815 Implemented
LL0332 # 02 Y:2010 02 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,014 $450 Implemented
LL0332 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $350 Implemented
LL0332 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $477 $30 Implemented
LL0332 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $372 $156 Implemented
LL0332 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $115 $300 Not Implemented
LL0332 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $110 $90 Implemented
IA0450 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,207 $29,505 Implemented
IA0450 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,373 $3,784 Implemented
IA0450 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $888 $2,230 Implemented
IA0450 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,759 $660 Not Implemented
IA0450 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,496 $20 Implemented
IA0450 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,382 $250 Implemented
IA0450 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $180 $150 Implemented
IA0450 # 08 Y:2010 08 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $711 $500 Not Implemented
IA0450 # 09 Y:2010 09 2010 METER WASTE WATER $794 $1,000 Not Implemented
IA0450 # 10 Y:2010 10 2010 REDUCE VENTILATION AIR $4,542 $2,000 Not Implemented
IA0450 # 11 Y:2010 11 2010 OPTIMIZE PLANT POWER FACTOR $2,499 $12,951 Not Implemented
GT0871 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,860 $768 Implemented
GT0871 # 02 Y:2010 02 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $20,114 $23,200 Not Implemented