Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2011 |
Principal Product | citrus oil |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 20,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $121,959 | 1,666,240 | kWh | $0.07 |
Electricity Demand | $43,927 | 3,587 | kW-months/year | $12.25 |
LPG | $213,226 | 11,113 | MMBtu | $19.19 |
TOTAL ENERGY COSTS | $379,112 | |||
RECOMMENDED SAVINGS* | $221,521 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $50,139 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,864 Cost: $4,542 |
$11,304 | 152,753 | $2,561 | 209 | - | - | - | - |
$11,304 152,753 kWh |
$2,561 209 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $5,543 Cost: $9,823 |
$3,071 | 41,496 | $2,472 | 202 | - | - | - | - |
$3,071 41,496 kWh |
$2,472 202 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $1,693 Cost: $939 |
$1,693 | 17,064 | - | - | - | - | - | - |
$1,693 17,064 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $25,323 Cost: $75,000 |
$25,323 | 253,225 | - | - | - | - | - | - |
$25,323 253,225 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $43,678 Cost: $2,580 |
- | - | - | - | $43,678 | 2,273 | - | - |
- - kWh |
- - kW-months/year |
$43,678 2,273 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $2,582 Cost: $2,580 |
$2,582 | 25,815 | - | - | - | - | - | - |
$2,582 25,815 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS |
Savings: $802 Cost: $1,378 |
$802 | 8,028 | - | - | - | - | - | - |
$802 8,028 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $735 Cost: $1,280 |
$735 | 9,802 | - | - | - | - | - | - |
$735 9,802 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,370 Cost: $8,778 |
$8,370 | 88,102 | - | - | - | - | - | - |
$8,370 88,102 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL |
Savings: $118,931 Cost: $150,000 |
- | - | - | - | - | - | $118,931 | 628,630 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$118,931 628,630 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $221,521 Cost: $256,900 |
$53,879 | 596,285 | $5,033 | 410 | $43,678 | 2,273 | $118,931 | 628,630 | $53,879 596,285 kWh |
$5,033 410 kW-months/year |
$43,678 2,273 MMBtu |
$118,931 628,630 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $50,139 Cost: $90,900 |
$47,579 | 519,895 | $2,561 | 209 | - | - | - | - | $47,579 519,895 kWh |
$2,561 209 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) |