IAC logo
IAC Assessment: UF0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2011
Principal Product citrus oil
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 40,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,959 1,666,240 kWh $0.07
Electricity Demand $43,927 3,587 kW-months/year $12.25
LPG $213,226 11,113 MMBtu $19.19
TOTAL ENERGY COSTS $379,112
RECOMMENDED SAVINGS* $221,521 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,139
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Electricity Usage Electricity Demand LPG Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,864
Cost:
$4,542
$11,304 152,753 $2,561 209 - - - - $11,304
152,753
kWh
$2,561
209
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$5,543
Cost:
$9,823
$3,071 41,496 $2,472 202 - - - - $3,071
41,496
kWh
$2,472
202
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$1,693
Cost:
$939
$1,693 17,064 - - - - - - $1,693
17,064
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$25,323
Cost:
$75,000
$25,323 253,225 - - - - - - $25,323
253,225
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$43,678
Cost:
$2,580
- - - - $43,678 2,273 - - -
-
kWh
-
-
kW-months/year
$43,678
2,273
MMBtu
-
-
lb
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,582
Cost:
$2,580
$2,582 25,815 - - - - - - $2,582
25,815
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$802
Cost:
$1,378
$802 8,028 - - - - - - $802
8,028
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$735
Cost:
$1,280
$735 9,802 - - - - - - $735
9,802
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,370
Cost:
$8,778
$8,370 88,102 - - - - - - $8,370
88,102
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
10: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$118,931
Cost:
$150,000
- - - - - - $118,931 628,630 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$118,931
628,630
lb
TOTAL RECOMMENDED Savings:
$221,521
Cost:
$256,900
$53,879 596,285 $5,033 410 $43,678 2,273 $118,931 628,630 $53,879
596,285
kWh
$5,033
410
kW-months/year
$43,678
2,273
MMBtu
$118,931
628,630
lb
TOTAL IMPLEMENTED Savings:
$50,139
Cost:
$90,900
$47,579 519,895 $2,561 209 - - - - $47,579
519,895
kWh
$2,561
209
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Electricity Usage Electricity Demand LPG Solid Waste (non-haz)