IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

923

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0871 # 03 Y:2010 03 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $40,118 $23,620 Implemented
GT0871 # 04 Y:2010 04 2010 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $119,576 $25,000 Not Implemented
GT0871 # 05 Y:2010 05 2010 UPGRADE CONTROLS ON COMPRESSORS $3,635 $22,000 Not Implemented
GT0871 # 06 Y:2010 06 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,535 $11,000 Not Implemented
GT0871 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,563 $17,696 Implemented
GT0871 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,500 $12,000 Not Implemented
LL0325 # 01 Y:2010 01 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $40,139 $3,000 Implemented
LL0325 # 02 Y:2010 02 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,692 $30 Implemented
LL0325 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,166 $595 Not Implemented
LL0325 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,019 $1,265 Implemented
LL0325 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $803 $623 Not Implemented
LL0325 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $114 $120 Not Implemented
LL0325 # 07 Y:2010 07 2010 USE PHOTOCELL CONTROLS $39 $30 Not Implemented
UM0359 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $20,146 $500 Implemented
UM0359 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,026 $50,000 Implemented
UM0359 # 03 Y:2009 03 2009 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $13,963 $400 Implemented
UM0359 # 04 Y:2009 04 2009 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $11,980 $9,000 Not Implemented
UM0359 # 05 Y:2009 05 2009 INSTALL STORM WINDOWS AND DOORS $6,298 $24,510 Implemented
UM0359 # 06 Y:2009 06 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,724 $7,574 Not Implemented
UM0359 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,630 $5,000 Not Implemented
UM0359 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,620 $10,000 Implemented
UM0359 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $1,161 $30,000 Implemented
UM0359 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $472 $10,000 Implemented
CO0620 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,390 $10,070 Not Implemented
CO0620 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,190 $11,640 Not Implemented