IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

923

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0242 # 12 Y:2003 12 2003 AUTOMATE PAYROLL SYSTEM $2,402 $1,500 Not Implemented
BD0242 # 13 Y:2003 13 2003 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,500 $248 Not Implemented
OK0668 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,150 $61,955 Not Implemented
OK0668 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,013 $38,456 Implemented
OK0668 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $6,113 $1,885 Implemented
OK0668 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,597 $0 Implemented
OK0668 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,238 $0 Implemented
OK0668 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,821 $1,125 Implemented
OK0668 # 07 Y:2003 07 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $50,260 $51,780 Not Implemented
OK0668 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,772 $9,500 Not Implemented
OK0668 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $1,369 $1,455 Implemented
OK0668 # 10 Y:2003 10 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,501 $6,296 Not Implemented
OK0668 # 11 Y:2003 11 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,447 $112,608 n/a
OK0668 # 12 Y:2003 12 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,404 $34,425 n/a
OK0668 # 13 Y:2003 13 2003 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $38,034 $1,647 Implemented
LL0159 # 01 Y:2003 01 2003 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $336,249 $481,633 Not Implemented
LL0159 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $217,796 $12,400 Implemented
LL0159 # 03 Y:2003 03 2003 USE PHOTOCELL CONTROLS $19,066 $924 Implemented
LL0159 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,635 $20 Implemented
LL0159 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $4,821 $1,204 Not Implemented
LL0159 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $4,389 $642 Implemented
LL0159 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $525 Not Implemented
IC0058 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $9,774 Implemented
IC0058 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,668 $1,551 Implemented
IC0058 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $1,137 $1,948 Not Implemented