Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
923
matching recommendationsNAICS | 3259 | Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0058 # 04 Y:2003 | 04 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,010 | $4,100 | Not Implemented |
IC0058 # 05 Y:2003 | 05 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,017 | $12,784 | Implemented |
UU0043 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $3,833 | $5,820 | Not Implemented |
UU0043 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,032 | $0 | Not Implemented |
UU0043 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,718 | $32,302 | Implemented |
UU0043 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,467 | $1,500 | Not Implemented |
UU0043 # 05 Y:2003 | 05 | 2003 | USE SYNTHETIC LUBRICANT | $4,235 | $400 | Not Implemented |
UU0043 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $790 | $400 | Not Implemented |
UU0043 # 07 Y:2003 | 07 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,677 | $0 | Implemented |
UU0043 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $816 | $406 | Not Implemented |
LE0144 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,579 | $1,000 | Not Implemented |
LE0144 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,456 | $0 | Not Implemented |
LE0144 # 03 Y:2002 | 03 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,820 | $9,600 | Not Implemented |
LE0144 # 04 Y:2002 | 04 | 2002 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $968 | $0 | Not Implemented |
LE0144 # 05 Y:2002 | 05 | 2002 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $636 | $0 | Not Implemented |
GT0746 # 01 Y:2003 | 01 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $11,932 | $44,000 | Not Implemented |
GT0746 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,422 | $0 | Not Implemented |
GT0746 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,113 | $28,000 | Not Implemented |
GT0746 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,727 | $2,500 | Implemented |
GT0746 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $593 | $0 | Implemented |
GT0746 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,357 | $20,000 | Not Implemented |
GT0746 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,222 | $14,500 | Not Implemented |
GT0746 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $227 | $150 | Not Implemented |