IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0359 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $472 $10,000 Implemented
UM0359 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $1,161 $30,000 Implemented
UM0359 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,620 $10,000 Implemented
UM0359 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,630 $5,000 Not Implemented
UM0359 # 06 Y:2009 06 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,724 $7,574 Not Implemented
UM0359 # 05 Y:2009 05 2009 INSTALL STORM WINDOWS AND DOORS $6,298 $24,510 Implemented
UM0359 # 04 Y:2009 04 2009 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $11,980 $9,000 Not Implemented
UM0359 # 03 Y:2009 03 2009 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $13,963 $400 Implemented
UM0359 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,026 $50,000 Implemented
UM0359 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $20,146 $500 Implemented
UM0324 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $5,954 $543 Not Implemented
UM0324 # 05 Y:2007 05 2007 OPTIMIZE PLANT POWER FACTOR $7,222 $6,917 Implemented
UM0324 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,978 $0 Implemented
UM0324 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,631 $4,000 Not Implemented
UM0324 # 01 Y:2007 01 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,396 $2,140 Not Implemented
UM0261 # 06 Y:2004 06 2004 COVER OPEN TANKS $625 $300 Implemented
UM0261 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,770 $1,711 Implemented
UM0261 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $6,503 $500 Implemented
UM0261 # 03 Y:2004 03 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,493 $2,000 Implemented
UM0261 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,377 $47,700 Not Implemented
UM0261 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $96,676 $11,096 Not Implemented