Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0203 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,835 | $1,480 | n/a |
IP0203 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,564 | $44 | n/a |
IP0203 # 02 Y:2024 | 02 | 2024 | INSTALL AUTOMATIC STACK DAMPER | $55,966 | $1,300 | n/a |
IP0203 # 01 Y:2024 | 01 | 2024 | USE AUTOMATIC FLOW CONTROL | $56,666 | $700 | n/a |
IP0203 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,015 | $1,072 | n/a |
IP0203 # 05 Y:2024 | 05 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $64,223 | $20,000 | n/a |
IC0297 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $289,074 | $1,202,972 | Not Implemented |
IC0297 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $5,801 | $2,620 | Implemented |
IC0297 # 12 Y:2024 | 12 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,395 | $609 | Implemented |
IC0297 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $2,433 | $1,693 | Implemented |
IC0297 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,704 | $1,123 | Not Implemented |
IC0297 # 13 Y:2024 | 13 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $4,854 | $360 | Implemented |
IC0297 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $26,122 | $13,370 | Implemented |
IC0297 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $2,641 | $1,066 | Implemented |
IC0297 # 11 Y:2024 | 11 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,441 | $13,680 | Not Implemented |
IC0297 # 09 Y:2024 | 09 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $983 | $378 | Not Implemented |
IC0297 # 15 Y:2024 | 15 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,222 | $0 | Implemented |
IC0297 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,288 | $1,336 | Implemented |
IC0297 # 16 Y:2024 | 16 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $57,855 | $47,950 | Not Implemented |
IC0297 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,754 | $36,000 | Implemented |
IC0297 # 10 Y:2024 | 10 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,801 | $0 | Implemented |
IC0297 # 14 Y:2024 | 14 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $119 | $0 | Implemented |
IP0119 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $768 | $28 | Not Implemented |
IP0119 # 05 Y:2019 | 05 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $27,937 | $38,052 | Implemented |
IP0119 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,002 | $875 | Implemented |