Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
865
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0548 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $2,573 | $5,317 | Implemented |
SD0548 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,113 | $1,500 | Implemented |
SD0548 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,052 | $360 | Implemented |
WV0537 # 01 Y:2017 | 01 | 2017 | USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS | $86,765 | $200,500 | Not Implemented |
WV0537 # 02 Y:2017 | 02 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $18,040 | $80,000 | Not Implemented |
WV0537 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,952 | $7,891 | Implemented |
WV0537 # 04 Y:2017 | 04 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,934 | $1,200 | Implemented |
WV0537 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,210 | $0 | Implemented |
WV0537 # 06 Y:2017 | 06 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $6,093 | $6,000 | Not Implemented |
WV0537 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,987 | $3,105 | Implemented |
WV0537 # 08 Y:2017 | 08 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,323 | $2,700 | Not Implemented |
WV0537 # 09 Y:2017 | 09 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,291 | $25 | Implemented |
WV0537 # 10 Y:2017 | 10 | 2017 | INSULATE BARE EQUIPMENT | $1,909 | $943 | Implemented |
WV0537 # 11 Y:2017 | 11 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,706 | $678 | Implemented |
WV0537 # 12 Y:2017 | 12 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,686 | $700 | Not Implemented |
WV0537 # 13 Y:2017 | 13 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,149 | $4,400 | Implemented |
WV0537 # 14 Y:2017 | 14 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $992 | $631 | Implemented |
MA0754 # 01 Y:2016 | 01 | 2016 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,595,248 | $5,445,000 | Not Implemented |
MA0754 # 02 Y:2016 | 02 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $112,215 | $1,000 | Not Implemented |
MA0754 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,309 | $500,000 | Not Implemented |
MA0754 # 04 Y:2016 | 04 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $62,104 | $250,000 | Not Implemented |
MA0754 # 05 Y:2016 | 05 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $34,769 | $3,000 | Implemented |
MA0754 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,043 | $13,895 | Implemented |
MA0754 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,913 | $4,940 | Implemented |
MA0754 # 08 Y:2016 | 08 | 2016 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $1,151 | $500 | Not Implemented |