Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0532 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,352 | $25,847 | Implemented |
UF0532 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,919 | $1,400 | Implemented |
UF0530 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,876 | $421 | Implemented |
UF0530 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,693 | $25,000 | Implemented |
UF0530 # 09 Y:2019 | 09 | 2019 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $1,181 | $2,000 | Not Implemented |
UF0530 # 08 Y:2019 | 08 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,535 | $5,998 | Not Implemented |
UF0530 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,859 | $22,491 | Not Implemented |
UF0530 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $94,823 | $80,000 | Implemented |
UF0530 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,402 | $0 | Implemented |
UF0530 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $60,494 | $202,420 | Implemented |
UF0530 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $47,739 | $25,000 | Implemented |
MI0246 # 08 Y:2013 | 08 | 2013 | PAY BILLS ON TIME TO AVOID LATE FEES | $945 | $240 | Implemented |
MI0246 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,416 | $2,300 | Implemented |
MI0246 # 02 Y:2013 | 02 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $14,747 | $17,000 | Implemented |
MI0246 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,442 | $1,660 | Implemented |
MI0246 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $2,851 | $417 | Not Implemented |
MI0246 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,190 | $2,520 | Not Implemented |
MI0246 # 06 Y:2013 | 06 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,076 | $6,910 | Not Implemented |
MI0246 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,508 | $4,420 | Implemented |
MI0246 # 09 Y:2013 | 09 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $876 | $80 | Implemented |
MI0235 # 14 Y:2013 | 14 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $648 | $693 | Implemented |
MI0235 # 13 Y:2013 | 13 | 2013 | INSTALL SKYLIGHTS | $704 | $1,200 | Not Implemented |
MI0235 # 12 Y:2013 | 12 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $855 | $660 | Not Implemented |
MI0235 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,581 | $1,660 | Implemented |
MI0235 # 05 Y:2013 | 05 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,349 | $1,400 | Implemented |