Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0359 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $1,161 | $30,000 | Implemented |
UM0359 # 04 Y:2009 | 04 | 2009 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $11,980 | $9,000 | Not Implemented |
UM0359 # 07 Y:2009 | 07 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,630 | $5,000 | Not Implemented |
UM0359 # 01 Y:2009 | 01 | 2009 | REDUCE VENTILATION AIR | $20,146 | $500 | Implemented |
UM0359 # 06 Y:2009 | 06 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,724 | $7,574 | Not Implemented |
UM0359 # 05 Y:2009 | 05 | 2009 | INSTALL STORM WINDOWS AND DOORS | $6,298 | $24,510 | Implemented |
UM0359 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,026 | $50,000 | Implemented |
UM0359 # 08 Y:2009 | 08 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,620 | $10,000 | Implemented |
UM0359 # 03 Y:2009 | 03 | 2009 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $13,963 | $400 | Implemented |
UM0359 # 10 Y:2009 | 10 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $472 | $10,000 | Implemented |
CO0620 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,390 | $10,070 | Not Implemented |
CO0620 # 04 Y:2009 | 04 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,820 | $5,850 | Not Implemented |
CO0620 # 03 Y:2009 | 03 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,980 | $7,320 | Not Implemented |
CO0620 # 02 Y:2009 | 02 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,190 | $11,640 | Not Implemented |
UD0795 # 01 Y:2009 | 01 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $40,310 | $0 | Implemented |
UD0795 # 12 Y:2009 | 12 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $481 | $200 | Not Implemented |
UD0795 # 11 Y:2009 | 11 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $554 | $0 | Not Implemented |
UD0795 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,251 | $3,537 | Not Implemented |
UD0795 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,807 | $2,958 | Not Implemented |
UD0795 # 08 Y:2009 | 08 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,781 | $0 | Implemented |
UD0795 # 07 Y:2009 | 07 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,002 | $10,000 | Not Implemented |
UD0795 # 06 Y:2009 | 06 | 2009 | INSULATE BARE EQUIPMENT | $2,125 | $300 | Not Implemented |
UD0795 # 05 Y:2009 | 05 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $2,905 | $500 | Implemented |
UD0795 # 04 Y:2009 | 04 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,717 | $11,000 | Not Implemented |
UD0795 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,955 | $43,300 | Not Implemented |