IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 325998 All Other Miscellaneous Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0235 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $942 $2,050 Not Implemented
MI0235 # 10 Y:2013 10 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $992 $2,520 Implemented
MI0235 # 09 Y:2013 09 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,188 $40 Implemented
MI0235 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,298 $80 Implemented
MI0235 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,562 $900 Implemented
MI0235 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,581 $1,660 Implemented
MI0235 # 05 Y:2013 05 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,349 $1,400 Implemented
MI0235 # 04 Y:2013 04 2013 HEAT WATER WITH EXHAUST HEAT $4,126 $14,000 Not Implemented
MI0235 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,094 $13,735 Implemented
UF0451 # 06 Y:2011 06 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $498 $0 Implemented
UF0451 # 07 Y:2011 07 2011 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $1,379 $1,140 Not Implemented
UF0451 # 08 Y:2011 08 2011 USE OPTIMUM THICKNESS INSULATION $1,327 $1,865 Not Implemented
UF0451 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,440 $3,310 Implemented
UF0451 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $1,277 Implemented
UF0451 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,497 $0 Not Implemented
UF0451 # 02 Y:2011 02 2011 INSTALL COMMON HEADER ON COMPRESSORS $8,773 $222 Implemented
UF0451 # 01 Y:2011 01 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,739 $0 Implemented
UF0445 # 07 Y:2011 07 2011 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $802 $1,378 Not Implemented
UF0445 # 06 Y:2011 06 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,582 $2,580 Implemented
UF0445 # 08 Y:2011 08 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $735 $1,280 Not Implemented
UF0445 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,370 $8,778 Implemented
UF0445 # 10 Y:2011 10 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $118,931 $150,000 Not Implemented
UF0445 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $43,678 $2,580 Not Implemented
UF0445 # 04 Y:2011 04 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $25,323 $75,000 Implemented
UF0445 # 03 Y:2011 03 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,693 $939 Not Implemented