Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
596
matching recommendationsNAICS | 325998 | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0546 # 05 Y:2020 | 05 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,023 | $60 | Not Implemented |
UF0543 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $107,586 | $164,741 | Implemented |
UF0543 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,229 | $88,272 | Implemented |
UF0543 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,476 | $0 | Implemented |
UF0541 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $365,719 | $1,800,000 | Implemented |
UF0541 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40,964 | $16,606 | Implemented |
UF0541 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $22,041 | $3,368 | Implemented |
UF0541 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $11,463 | $2,551 | Implemented |
UF0541 # 05 Y:2019 | 05 | 2019 | INSTALL TURBULATORS | $5,920 | $7,500 | Not Implemented |
UF0541 # 06 Y:2019 | 06 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,871 | $1,550 | Implemented |
UF0532 # 01 Y:2019 | 01 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,174 | $25,000 | Implemented |
UF0532 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,919 | $1,400 | Implemented |
UF0532 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,352 | $25,847 | Implemented |
UF0532 # 04 Y:2019 | 04 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,403 | $5,998 | Not Implemented |
UF0532 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,301 | $421 | Implemented |
UF0532 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $1,094 | $230 | Not Implemented |
UF0532 # 07 Y:2019 | 07 | 2019 | REDUCE OR ELIMINATE WASTE | $19,196 | $40,500 | Implemented |
UF0530 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $94,823 | $80,000 | Implemented |
UF0530 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $60,494 | $202,420 | Implemented |
UF0530 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $47,739 | $25,000 | Implemented |
UF0530 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,693 | $25,000 | Implemented |
UF0530 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,859 | $22,491 | Not Implemented |
UF0530 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,402 | $0 | Implemented |
UF0530 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,876 | $421 | Implemented |
UF0530 # 08 Y:2019 | 08 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,535 | $5,998 | Not Implemented |