Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 325998 | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0332 # 07 Y:2010 | 07 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $110 | $90 | Implemented |
LL0332 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $115 | $300 | Not Implemented |
LL0332 # 05 Y:2010 | 05 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $372 | $156 | Implemented |
LL0332 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $477 | $30 | Implemented |
LL0332 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $658 | $350 | Implemented |
LL0332 # 02 Y:2010 | 02 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,014 | $450 | Implemented |
LL0332 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,186 | $1,815 | Implemented |
IA0450 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,382 | $250 | Implemented |
IA0450 # 11 Y:2010 | 11 | 2010 | OPTIMIZE PLANT POWER FACTOR | $2,499 | $12,951 | Not Implemented |
IA0450 # 10 Y:2010 | 10 | 2010 | REDUCE VENTILATION AIR | $4,542 | $2,000 | Not Implemented |
IA0450 # 09 Y:2010 | 09 | 2010 | METER WASTE WATER | $794 | $1,000 | Not Implemented |
IA0450 # 08 Y:2010 | 08 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $711 | $500 | Not Implemented |
IA0450 # 07 Y:2010 | 07 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $180 | $150 | Implemented |
IA0450 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,496 | $20 | Implemented |
IA0450 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,759 | $660 | Not Implemented |
IA0450 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $888 | $2,230 | Implemented |
IA0450 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,373 | $3,784 | Implemented |
IA0450 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,207 | $29,505 | Implemented |
GT0871 # 01 Y:2010 | 01 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,860 | $768 | Implemented |
GT0871 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,500 | $12,000 | Not Implemented |
GT0871 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,563 | $17,696 | Implemented |
GT0871 # 06 Y:2010 | 06 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $16,535 | $11,000 | Not Implemented |
GT0871 # 05 Y:2010 | 05 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $3,635 | $22,000 | Not Implemented |
GT0871 # 04 Y:2010 | 04 | 2010 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $119,576 | $25,000 | Not Implemented |
GT0871 # 03 Y:2010 | 03 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $40,118 | $23,620 | Implemented |