Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsNAICS | 325998 | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2407 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,641 | $633,762 | n/a |
UC2407 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $115,385 | $54,067 | n/a |
UC2407 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,041 | $5,000 | n/a |
UC2407 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $588 | $1,300 | n/a |
UC2407 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $504 | $75 | n/a |
UC2407 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,157 | $100 | n/a |
UC2407 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $123 | $139 | n/a |
UC2407 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $208 | $0 | n/a |
UC2407 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,850 | $0 | n/a |
LS2409 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,382 | $165 | n/a |
LS2409 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $11,502 | $18,750 | n/a |
LS2409 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,911 | $2,088 | n/a |
LS2409 # 05 Y:2024 | 05 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $18,443 | $20,000 | n/a |
LS2409 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $162,757 | $116,320 | n/a |
LS2409 # 03 Y:2024 | 03 | 2024 | INSTALL SUB-METERING EQUIPMENT | $13,250 | $9,000 | n/a |
LS2409 # 02 Y:2024 | 02 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $5,037 | $2,600 | n/a |
IC0297 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,288 | $1,336 | n/a |
IC0297 # 16 Y:2024 | 16 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $57,855 | $47,950 | n/a |
IC0297 # 15 Y:2024 | 15 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,222 | $0 | n/a |
IC0297 # 14 Y:2024 | 14 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $119 | $0 | n/a |
IC0297 # 13 Y:2024 | 13 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $4,854 | $360 | n/a |
IC0297 # 12 Y:2024 | 12 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,395 | $609 | n/a |
IC0297 # 11 Y:2024 | 11 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,441 | $13,680 | n/a |
IC0297 # 10 Y:2024 | 10 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,801 | $0 | n/a |
IC0297 # 09 Y:2024 | 09 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $983 | $378 | n/a |