IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2306 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $336 $600 Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UK1912 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $86,767 $5,000 Implemented
UK1912 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,541 $0 Implemented
UK1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,487 $2,150 Implemented
UK1912 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,364 $30,555 Implemented
UK1707 # 10 Y:2017 10 2017 OPTIMIZE PLANT POWER FACTOR $81,973 $62,685 Implemented
UK1707 # 12 Y:2017 12 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,296 $2,550 Implemented
UK1707 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,235 $2,650 Implemented
UK1707 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99,925 $62,274 Implemented
UK1707 # 11 Y:2017 11 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $34,216 $0 Implemented
UK1707 # 01 Y:2017 01 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,711,450 $2,189,000 Implemented
UK1707 # 05 Y:2017 05 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $2,584 $6,427 Implemented
UK1707 # 04 Y:2017 04 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,886 $11,500 Implemented
UK1707 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,257 $900 Implemented
UK1610 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $196 $500 Implemented
UK1610 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $4,985 Implemented
UK1610 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $374 $148 Implemented
UK1610 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $525 $0 Implemented
UK1610 # 08 Y:2016 08 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,083 $500 Implemented
UK1504 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,819 $0 Implemented
UK1504 # 07 Y:2015 07 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $6,448 $6,381 Implemented
UK1504 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $2,405 $810 Implemented