IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2202 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,581 $876,160 Implemented
UW2202 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,538 $9,763 Implemented
UW2202 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,645 $10,782 Implemented
UW2202 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,233 $12,913 Implemented
OR0732 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,378 $0 Implemented
OR0719 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $7,063 $6,896 Implemented
OR0719 # 03 Y:2019 03 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,031 $9,861 Implemented
OR0719 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $8,576 $12,018 Implemented
OR0673 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,464 $0 Implemented
OR0673 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,117 $5,344 Implemented
OR0593 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,751 $4,751 Implemented
OR0588 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $17,738 $17,500 Implemented
OR0588 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,053 $8,053 Implemented
OR0588 # 01 Y:2012 01 2012 IMPROVE HANDLING PRACTICES $7,884 $60 Implemented
UW0029 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,713 $9,934 Implemented
UW0029 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $3,269 $3,800 Implemented
UW0029 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,416 $120,000 Implemented
UW0029 # 02 Y:2009 02 2009 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,263 $17,000 Implemented
UW0010 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,108 $4,160 Implemented
UW0008 # 01 Y:2007 01 2007 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $136,932 $492,147 Implemented
UW0008 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $1,092 $700 Implemented
UW0008 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,480 $11,244 Implemented
UW0008 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,830 $81,585 Implemented
OR0473 # 01 Y:2004 01 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $7,000 $7,000 Implemented
OR0473 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,530 $2,200 Implemented