Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
92
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0409 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $44,271 | $0 | n/a |
MS0409 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $96 | $582 | n/a |
MS0409 # 03 Y:2022 | 03 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,770 | $0 | n/a |
UA0213 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,647 | $100 | Not Implemented |
UA0213 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,067 | $30,000 | Not Implemented |
UA0213 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,484 | $31,859 | Not Implemented |
UA0213 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,549 | $1,294 | Implemented |
UA0213 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,098 | $4,895 | Implemented |
UA0213 # 06 Y:2019 | 06 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,399 | $4,370 | Not Implemented |
UA0112 # 05 Y:2013 | 05 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $1,143 | $520 | Not Implemented |
UA0112 # 01 Y:2013 | 01 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,737 | $19,304 | Not Implemented |
UA0112 # 03 Y:2013 | 03 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,177 | $878 | Implemented |
UA0112 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,965 | $49,792 | Not Implemented |
UA0112 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,385 | $2,330 | Implemented |
UA0101 # 05 Y:2013 | 05 | 2013 | USE PHOTOCELL CONTROLS | $580 | $251 | Implemented |
UA0101 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,664 | $7,400 | Not Implemented |
UA0101 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,670 | $80 | Implemented |
UA0101 # 06 Y:2013 | 06 | 2013 | REPLACE BOILER | $14,175 | $112,000 | Not Implemented |
UA0101 # 01 Y:2013 | 01 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $16,195 | $150 | Implemented |
UA0101 # 04 Y:2013 | 04 | 2013 | MINIMIZE WATER USAGE | $20,266 | $8,192 | Not Implemented |
UA0085 # 10 Y:2012 | 10 | 2012 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $529,960 | $400,000 | Not Implemented |
UA0085 # 08 Y:2012 | 08 | 2012 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $48,968 | $131,587 | Not Implemented |
UA0085 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $58,443 | $1,920 | Implemented |
UA0085 # 01 Y:2012 | 01 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $6,264,801 | $14,443,176 | Not Implemented |
UA0085 # 03 Y:2012 | 03 | 2012 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $86,957 | $214,808 | Not Implemented |