IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0450 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,894 $80 n/a
MI0450 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $7,120 $17,650 n/a
MI0450 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,159 $3,200 n/a
MI0450 # 04 Y:2024 04 2024 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,036 $240 n/a
MI0450 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $53 $0 n/a
MI0450 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,369 $4,496 n/a
MI0406 # 07 Y:2022 07 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,016 $100 Not Implemented
MI0406 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $5,579 $15,821 Implemented
MI0406 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,075 $5,674 Implemented
MI0406 # 06 Y:2022 06 2022 ELIMINATE/REDUCE AN OPERATION $4,770 $960 Implemented
MI0406 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,298 $45,090 Implemented
MI0406 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,550 $2,031 Implemented
MI0406 # 04 Y:2022 04 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,468 $15,450 Implemented
MI0396 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,464 $3,060 Not Implemented
MI0396 # 01 Y:2021 01 2021 PAY UTILITY BILLS ON TIME $27,408 $0 Implemented
MI0396 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,908 $2,020 Implemented
MI0396 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,263 $1,487 Not Implemented
MI0396 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,588 $100 Not Implemented
MI0396 # 06 Y:2021 06 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,320 $1,290 Not Implemented
MI0351 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $87,352 $12,000 Implemented
MI0351 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,064 $2,020 Implemented
MI0351 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,747 $480 Implemented
MI0351 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,493 $11,078 Implemented
MI0351 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $14,383 $25,700 Not Implemented
MI0351 # 04 Y:2019 04 2019 USE SOLAR HEAT TO HEAT WATER $34,199 $21,195 Not Implemented