IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

410

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0028 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $655 $2,312 Not Implemented
IP0028 # 07 Y:2014 07 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,354 $5,025 Not Implemented
IP0025 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,805 $0 Not Implemented
IP0025 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,161 $0 Not Implemented
IP0025 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Not Implemented
IP0025 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,545 $0 Not Implemented
IP0025 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,759 $60 Not Implemented
IP0025 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,468 $0 Not Implemented
IP0025 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,123 $1,770 Not Implemented
IP0025 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,944 $3,961 Not Implemented
UD0852 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $156,438 $342,000 Not Implemented
UD0852 # 02 Y:2012 02 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $13,731 $8,250 Not Implemented
UD0852 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,349 $0 Implemented
UD0852 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,934 $6,000 Implemented
UD0852 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,072 $1,000 Implemented
UD0852 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,716 $5,000 Not Implemented
UD0852 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $94,327 $190,000 Not Implemented
UD0852 # 08 Y:2012 08 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,333 $50,000 Implemented
UD0852 # 09 Y:2012 09 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $27,604 $106,738 Not Implemented
UD0853 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,419 $28,511 Not Implemented
UD0853 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $3,815 Not Implemented
UD0853 # 03 Y:2012 03 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $15,738 $600 Not Implemented
UD0853 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,192 $5,500 Not Implemented
UD0853 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $6,272 $6,000 Not Implemented
UD0853 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,059 $7,000 Not Implemented