IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0490 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $643 $300 Not Implemented
BD0490 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $630 $800 Implemented
BD0490 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $478 $20 Not Implemented
BD0490 # 10 Y:2016 10 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $394 $400 Not Implemented
IA0564 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,030 $79,697 Not Implemented
IA0564 # 02 Y:2016 02 2016 DISCONNECT BALLASTS $5,350 $3,960 Not Implemented
IA0564 # 03 Y:2016 03 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,116 $5,057 Not Implemented
IA0564 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,878 $328 Not Implemented
IA0564 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,430 $1,680 Not Implemented
IA0564 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $914 $386 Not Implemented
IA0564 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $137 $70 Not Implemented
UD0955 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $191 $0 Not Implemented
UD0955 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $15,783 $5,438 Not Implemented
UD0955 # 03 Y:2016 03 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $15,101 $15,500 Not Implemented
UD0955 # 04 Y:2016 04 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,343 $1,152 Not Implemented
UD0955 # 05 Y:2016 05 2016 COMBINE UTILITY METERS $2,301 $0 Not Implemented
UD0955 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $260 $17 Not Implemented
UD0955 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $319 $1,000 Not Implemented
UD0955 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $4,363 $21,980 Not Implemented
UD0955 # 09 Y:2016 09 2016 USE RADIANT HEATER FOR SPOT HEATING $3,109 $9,840 Not Implemented
UD0955 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,366 $23,200 Not Implemented
WV0532 # 05 Y:2016 05 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,095 $730 Implemented
WV0532 # 01 Y:2016 01 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $35,091 $2,025 Not Implemented
WV0532 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,778 $25,000 Not Implemented
WV0532 # 03 Y:2016 03 2016 USE RADIANT HEATER FOR SPOT HEATING $7,492 $18,550 Not Implemented