Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
452
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0418 # 14 Y:2008 | 14 | 2008 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $170,526 | $5,967 | Not Implemented |
UF0418 # 15 Y:2008 | 15 | 2008 | MAINTAIN MACHINES TO REDUCE LEAKS | $6,175 | $161 | Implemented |
UF0418 # 16 Y:2008 | 16 | 2008 | CLEAN FOULING FROM WATER LINES REGULARLY | $2,344 | $7,838 | Implemented |
UF0415 # 01 Y:2008 | 01 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $662 | $300 | Not Implemented |
UF0415 # 02 Y:2008 | 02 | 2008 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $19,825 | $20,000 | Not Implemented |
UF0415 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,271 | $400 | Not Implemented |
UF0415 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,736 | $30,084 | Implemented |
UF0415 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $666 | $0 | Implemented |
UF0415 # 06 Y:2008 | 06 | 2008 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $27,511 | $182,894 | Not Implemented |
UF0415 # 07 Y:2008 | 07 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $648 | $0 | Implemented |
UF0415 # 08 Y:2008 | 08 | 2008 | INSTALL COMMON HEADER ON COMPRESSORS | $6,290 | $550 | Not Implemented |
UF0415 # 09 Y:2008 | 09 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $49,178 | $49,400 | Not Implemented |
MI0165 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $94,777 | $315,000 | Not Implemented |
MI0165 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,654 | $41,800 | Implemented |
MI0165 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,875 | $1,210 | Implemented |
MI0165 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,496 | $40 | Implemented |
MI0165 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $4,023 | $1,957 | Implemented |
MI0158 # 01 Y:2007 | 01 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $92,023 | $8,580 | Implemented |
MI0158 # 02 Y:2007 | 02 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $55,437 | $101,347 | Implemented |
MI0158 # 03 Y:2007 | 03 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,358 | $46,238 | Not Implemented |
MI0158 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,963 | $20,900 | Implemented |
MI0158 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,507 | $1,210 | Implemented |
MI0158 # 06 Y:2007 | 06 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $13,330 | $1,700 | Implemented |
MI0158 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,478 | $5,967 | Not Implemented |
MI0158 # 08 Y:2007 | 08 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,282 | $3,475 | Not Implemented |