IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

452

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0418 # 14 Y:2008 14 2008 CHECK FOR ACCURACY OF UTILITY / POWER METERS $170,526 $5,967 Not Implemented
UF0418 # 15 Y:2008 15 2008 MAINTAIN MACHINES TO REDUCE LEAKS $6,175 $161 Implemented
UF0418 # 16 Y:2008 16 2008 CLEAN FOULING FROM WATER LINES REGULARLY $2,344 $7,838 Implemented
UF0415 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $662 $300 Not Implemented
UF0415 # 02 Y:2008 02 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $19,825 $20,000 Not Implemented
UF0415 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,271 $400 Not Implemented
UF0415 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,736 $30,084 Implemented
UF0415 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $666 $0 Implemented
UF0415 # 06 Y:2008 06 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $27,511 $182,894 Not Implemented
UF0415 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $648 $0 Implemented
UF0415 # 08 Y:2008 08 2008 INSTALL COMMON HEADER ON COMPRESSORS $6,290 $550 Not Implemented
UF0415 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $49,178 $49,400 Not Implemented
MI0165 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $94,777 $315,000 Not Implemented
MI0165 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,654 $41,800 Implemented
MI0165 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,875 $1,210 Implemented
MI0165 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,496 $40 Implemented
MI0165 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,023 $1,957 Implemented
MI0158 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $92,023 $8,580 Implemented
MI0158 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,437 $101,347 Implemented
MI0158 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,358 $46,238 Not Implemented
MI0158 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,963 $20,900 Implemented
MI0158 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,507 $1,210 Implemented
MI0158 # 06 Y:2007 06 2007 REPAIR OR REPLACE STEAM TRAPS $13,330 $1,700 Implemented
MI0158 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,478 $5,967 Not Implemented
MI0158 # 08 Y:2007 08 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,282 $3,475 Not Implemented