Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0401 # 06 Y:2015 | 06 | 2015 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $218 | $404 | Not Implemented |
SU0401 # 07 Y:2015 | 07 | 2015 | ELIMINATE/REDUCE AN OPERATION | $956 | $3,709 | Not Implemented |
SU0401 # 08 Y:2015 | 08 | 2015 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $9,780 | $49,000 | Not Implemented |
IP0055 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,465 | $3 | Not Implemented |
IP0055 # 02 Y:2015 | 02 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,351 | $0 | Implemented |
IP0055 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,460 | $3 | Implemented |
IP0055 # 04 Y:2015 | 04 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,413 | $3 | Not Implemented |
IP0055 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,177 | $86 | Implemented |
IP0055 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,460 | $1,880 | Not Implemented |
IP0055 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $568 | $1,146 | Not Implemented |
BD0468 # 01 Y:2015 | 01 | 2015 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $109,964 | $421,778 | Not Implemented |
BD0468 # 02 Y:2015 | 02 | 2015 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $22,812 | $4,180 | Not Implemented |
BD0468 # 03 Y:2015 | 03 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $12,081 | $30,000 | Not Implemented |
BD0468 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $857 | $2,096 | Not Implemented |
BD0468 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $792 | $450 | Not Implemented |
BD0468 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $778 | $1,230 | Not Implemented |
BD0468 # 07 Y:2015 | 07 | 2015 | USE POWER DURING OFF-PEAK PERIODS | $539 | $20 | Not Implemented |
BD0468 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $971 | $1,050 | Not Implemented |
BD0468 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $326 | $275 | Not Implemented |
BD0468 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $268 | $119 | Not Implemented |
MZ0192 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,801 | $1,160 | Implemented |
MZ0192 # 02 Y:2015 | 02 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,360 | $6,100 | Implemented |
MZ0192 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $920 | Implemented |
MZ0192 # 04 Y:2015 | 04 | 2015 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $8,654 | $19,200 | Not Implemented |
MZ0192 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,211 | $0 | Implemented |