IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

452

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0158 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,073 $40 Implemented
MI0158 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,886 $2,000 Implemented
UF0404 # 01 Y:2007 01 2007 USE OPTIMUM THICKNESS INSULATION $45,739 $1,287 Implemented
UF0404 # 02 Y:2007 02 2007 USE OPTIMUM THICKNESS INSULATION $10,863 $369 Implemented
UF0404 # 03 Y:2007 03 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,502 $4,417 Not Implemented
UF0404 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,757 $5,610 Not Implemented
UF0404 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $603 $230 Implemented
UF0404 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,133 $15,174 Implemented
UF0404 # 07 Y:2007 07 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,571 $15,174 Implemented
UF0404 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,000 $270 Implemented
UF0401 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,913 $36,935 Not Implemented
UF0401 # 02 Y:2007 02 2007 INSTALL SKYLIGHTS $6,200 $14,564 Not Implemented
UF0401 # 03 Y:2007 03 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,038 $0 Implemented
UF0401 # 04 Y:2007 04 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,673 $2,571 Implemented
UF0401 # 05 Y:2007 05 2007 ELIMINATE A BY-PRODUCT $3,032 $158 Implemented
UF0401 # 06 Y:2007 06 2007 IMPROVE SPACE COMFORT CONDITIONING $13,160 $26,800 Not Implemented
UF0401 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,239 $638 Implemented
UF0401 # 08 Y:2007 08 2007 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,850 $957 Not Implemented
UF0401 # 09 Y:2007 09 2007 INSTALL EQUIPMENT TO MOVE PRODUCT $32,175 $1,260 Not Implemented
UF0401 # 10 Y:2007 10 2007 INSTALL EQUIPMENT TO MOVE PRODUCT $8,845 $43,500 Not Implemented
MI0140 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,875 $30 Implemented
MI0140 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,834 $1,074 Implemented
MI0140 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,779 $41,070 Not Implemented
MI0140 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,195 $940 Implemented
MI0140 # 05 Y:2006 05 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,523 $6,267 Not Implemented