IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0029 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,132 $3,066 Not Implemented
WM0029 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,542 $1,240 Implemented
WM0029 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,494 $2,200 Not Implemented
WM0029 # 04 Y:2013 04 2013 USE SYNTHETIC LUBRICANT $23,138 $22,800 Not Implemented
WM0029 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,925 $4,915 Implemented
WM0029 # 06 Y:2013 06 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,541 $70,000 Not Implemented
WM0029 # 07 Y:2013 07 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $797 $2,276 Not Implemented
WM0029 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149 $520 Not Implemented
WM0029 # 09 Y:2013 09 2013 REDUCE FLUID FLOW RATES $434 $2,085 Not Implemented
WM0029 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,633 $644 Implemented
SF0439 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,879 $35,000 Implemented
SF0439 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,908 $12,499 Implemented
SF0439 # 07 Y:2013 07 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $3,902 $3,286 Not Implemented
SF0439 # 08 Y:2013 08 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,037 $10,104 Implemented
SF0439 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,058 $18,484 Not Implemented
SF0439 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,646 $8,690 Not Implemented
SF0439 # 11 Y:2013 11 2013 INSTALL OCCUPANCY SENSORS $6,030 $22,132 Not Implemented
SF0439 # 12 Y:2013 12 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,184 $91,986 Not Implemented
SF0439 # 13 Y:2013 13 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,151 $18,136 Not Implemented
SF0439 # 14 Y:2013 14 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $370 $1,980 Not Implemented
SF0439 # 15 Y:2013 15 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,319 $118,398 Not Implemented
SF0439 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,213 $0 Implemented
SF0439 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $3,654 $436 Implemented
SF0439 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $34,286 $4,843 Implemented
SF0439 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $620 $359 Implemented