IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0108 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,157 $800 Implemented
UA0108 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $1,900 Implemented
UA0108 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $4,734 $858 Implemented
UA0108 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $145 $607 Not Implemented
UA0108 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,894 $490 Implemented
UA0108 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,603 $2,591 Implemented
UA0108 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,872 $1,425 Not Implemented
UA0108 # 08 Y:2013 08 2013 INSTALL TIMERS AND/OR THERMOSTATS $2,099 $152 Implemented
WM0028 # 01 Y:2013 01 2013 ISOLATE HOT OR COLD EQUIPMENT $77 $18 Not Implemented
WM0028 # 02 Y:2013 02 2013 ISOLATE HOT OR COLD EQUIPMENT $168 $420 Not Implemented
WM0028 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $310 $135 Not Implemented
WM0028 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $354 $255 Not Implemented
WM0028 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $3,892 Not Implemented
WM0028 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,111 $0 Implemented
WM0028 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,566 $1,034 Not Implemented
WM0028 # 08 Y:2013 08 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,581 $1,410 Not Implemented
WM0028 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,380 $1,790 Not Implemented
WM0028 # 10 Y:2013 10 2013 RECOVER AND REUSE COOLING WATER $41,508 $45,500 Not Implemented
TT0115 # 01 Y:2013 01 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,000 $50,000 Implemented
TT0115 # 02 Y:2013 02 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $18,000 $50,000 Implemented
TT0115 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,000 $50,000 Not Implemented
TT0115 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $32,990 $129,250 Not Implemented
TT0115 # 05 Y:2013 05 2013 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $146,360 $450,000 Not Implemented
TT0115 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,000 $4,000 Not Implemented
TT0115 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,635 $2,500 Not Implemented