IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0807 # 15 Y:2009 15 2009 INSULATE BARE EQUIPMENT $3,086 $2,700 Not Implemented
UD0807 # 16 Y:2009 16 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $2,000 Not Implemented
UD0807 # 17 Y:2009 17 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $2,533 Implemented
IA0446 # 19 Y:2009 19 2009 AIR CONDITION ONLY SPACE NECESSARY $1,847 $3,725 Not Implemented
IA0446 # 20 Y:2009 20 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $943 $2,600 Not Implemented
IA0446 # 21 Y:2009 21 2009 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,298 $115 Implemented
IA0446 # 22 Y:2009 22 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $19,469 $15,000 Implemented
IA0446 # 23 Y:2009 23 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,312 $2,060 Implemented
IA0446 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,768 $5,819 Implemented
IA0446 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,189 $29,591 Implemented
IA0446 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,951 $12,486 Implemented
IA0446 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,368 $32,570 Implemented
IA0446 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $374 $876 Implemented
IA0446 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,146 $268 Implemented
IA0446 # 07 Y:2009 07 2009 COVER OPEN TANKS $26,317 $20,000 Not Implemented
IA0446 # 08 Y:2009 08 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $23,136 $15,000 Not Implemented
IA0446 # 09 Y:2009 09 2009 INSULATE BARE EQUIPMENT $4,474 $3,180 Not Implemented
IA0446 # 10 Y:2009 10 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,136 $740 Implemented
IA0446 # 11 Y:2009 11 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,917 $1,860 Not Implemented
IA0446 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,241 $15 Not Implemented
IA0446 # 13 Y:2009 13 2009 RECOVER WASTE HEAT FROM EQUIPMENT $21,403 $1,860 Not Implemented
IA0446 # 14 Y:2009 14 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $505 $1,000 Not Implemented
IA0446 # 15 Y:2009 15 2009 DIRECT WARMEST AIR TO COMBUSTION INTAKE $333 $213 Not Implemented
IA0446 # 16 Y:2009 16 2009 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $16,258 $40,000 Implemented
IA0446 # 17 Y:2009 17 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,399 $1,461 Not Implemented