IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,054

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0844 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,557 $0 Implemented
UD0844 # 06 Y:2011 06 2011 UPGRADE CONTROLS ON COMPRESSORS $20,051 $18,555 Not Implemented
UD0844 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,542 $0 Not Implemented
UD0844 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,988 $5,000 Not Implemented
UD0844 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,616 $500 Not Implemented
UD0844 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $267 $0 Implemented
UD0844 # 11 Y:2011 11 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,123 $1,000 Implemented
UD0844 # 12 Y:2011 12 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,508 $16,000 Not Implemented
UD0844 # 13 Y:2011 13 2011 USE OPTIMUM TEMPERATURE $3,225 $0 Not Implemented
UD0844 # 14 Y:2011 14 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,762 $0 Implemented
UD0844 # 15 Y:2011 15 2011 REDUCE VENTILATION AIR $17,779 $0 Not Implemented
UD0843 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,904 $5,808 Not Implemented
UD0843 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,289 $4,698 Implemented
UD0843 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,854 $0 Implemented
UD0843 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,212 $5,000 Not Implemented
UD0843 # 08 Y:2011 08 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $509 $0 Implemented
UD0843 # 09 Y:2011 09 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,145 $650 Implemented
UD0843 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,573 $18,563 Not Implemented
UD0843 # 02 Y:2011 02 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,770 $0 Implemented
UD0843 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $143 $407 Not Implemented
WV0435 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,580 $26,175 Not Implemented
WV0435 # 02 Y:2011 02 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,088 $2,144 Implemented
WV0435 # 03 Y:2011 03 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,062 $10,480 Not Implemented
WV0435 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,758 $272 Implemented
WV0435 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $2,651 $5,480 Not Implemented