IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0007 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,816 $1,400 Not Implemented
UA0007 # 10 Y:2007 10 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,456 $0 Not Implemented
UA0007 # 11 Y:2007 11 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,335 $7,017 Not Implemented
UA0007 # 12 Y:2007 12 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,979 $1,979 Not Implemented
UA0007 # 13 Y:2007 13 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $717 $1,940 Not Implemented
UA0007 # 14 Y:2007 14 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $768 $0 Not Implemented
UA0007 # 15 Y:2007 15 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,267 $250 Not Implemented
UF0404 # 01 Y:2007 01 2007 USE OPTIMUM THICKNESS INSULATION $45,739 $1,287 Implemented
UF0404 # 02 Y:2007 02 2007 USE OPTIMUM THICKNESS INSULATION $10,863 $369 Implemented
UF0404 # 03 Y:2007 03 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,502 $4,417 Not Implemented
UF0404 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,757 $5,610 Not Implemented
UF0404 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $603 $230 Implemented
UF0404 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,133 $15,174 Implemented
UF0404 # 07 Y:2007 07 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,571 $15,174 Implemented
UF0404 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,000 $270 Implemented
MI0151 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $46,436 $1,955 Not Implemented
MI0151 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $67,528 $120 Implemented
MI0151 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,594 $20,498 Implemented
MI0151 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,109 $1,074 Implemented
MI0151 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,528 $3,010 Not Implemented
MI0151 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,331 $30 Not Implemented
SF0345 # 01 Y:2007 01 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,945 $711 Not Implemented
SF0345 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,951 $2,939 Not Implemented
SF0345 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,919 $5,140 Not Implemented
SF0345 # 04 Y:2007 04 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,019 $711 Not Implemented