Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2008 |
Principal Product | Vinyl Composition Tile |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 131 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 3,000,000 Pieces |
Production Hrs. Annual | 5,880 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,412,058 | 16,911,922 | kWh | $0.08 |
Electricity Demand | $644,355 | 45,096 | kW-months/year | $14.29 |
Natural Gas | $313,208 | 46,775 | MMBtu | $6.70 |
Other Gas | $72,309 | - | MMBtu | - |
TOTAL ENERGY COSTS | $2,441,930 | |||
RECOMMENDED SAVINGS* | $1,046,804 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $94,642 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $824,374 Cost: $6,360,000 |
$1,186,600 | 14,210,784 | $436,215 | 30,528 | - | - | $(-752,938) | (-112,446) | $(-45,503) | - |
$1,186,600 14,210,784 kWh |
$436,215 30,528 kW-months/year |
- - $ |
$(-752,938) (-112,446) MMBtu |
$(-45,503) - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $41,267 Cost: - |
- | - | - | - | $41,267 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$41,267 - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $33,992 Cost: $2,250 |
$25,190 | 301,681 | $8,802 | 616 | - | - | - | - | - | - |
$25,190 301,681 kWh |
$8,802 616 kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $28,203 Cost: $56,758 |
$20,430 | 244,671 | $7,773 | 544 | - | - | - | - | - | - |
$20,430 244,671 kWh |
$7,773 544 kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $26,826 Cost: $81,570 |
$26,826 | 321,269 | - | - | - | - | - | - | - | - |
$26,826 321,269 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $24,980 Cost: - |
$13,335 | 159,703 | - | - | $11,645 | - | - | - | - | - |
$13,335 159,703 kWh |
- - kW-months/year |
$11,645 - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $22,978 Cost: $11,522 |
$22,978 | 275,184 | - | - | - | - | - | - | - | - |
$22,978 275,184 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,624 Cost: $24,471 |
$13,624 | 163,158 | - | - | - | - | - | - | - | - |
$13,624 163,158 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $10,867 Cost: $500 |
$10,867 | 130,147 | - | - | - | - | - | - | - | - |
$10,867 130,147 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,041 Cost: $5,849 |
$8,041 | 96,294 | - | - | - | - | - | - | - | - |
$8,041 96,294 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7145 INSTALL SKYLIGHTS |
Savings: $7,467 Cost: $22,980 |
$5,538 | 66,324 | $1,929 | 135 | - | - | - | - | - | - |
$5,538 66,324 kWh |
$1,929 135 kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $4,185 Cost: - |
- | - | - | - | $4,185 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,185 - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,046,804 Cost: $6,565,900 |
$1,333,429 | 15,969,215 | $454,719 | 31,823 | $57,097 | - | $(-752,938) | (-112,446) | $(-45,503) | - | $1,333,429 15,969,215 kWh |
$454,719 31,823 kW-months/year |
$57,097 - $ |
$(-752,938) (-112,446) MMBtu |
$(-45,503) - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $94,642 Cost: $81,988 |
$64,493 | 772,379 | $18,504 | 1,295 | $11,645 | - | - | - | - | - | $64,493 772,379 kWh |
$18,504 1,295 kW-months/year |
$11,645 - $ |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Other Gas |