Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
354
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0303 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,170 | $360 | Implemented |
MZ0302 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $2,138 | $1,800 | Not Implemented |
MZ0302 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,817 | $55,992 | Implemented |
MZ0302 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $217 | $45 | Implemented |
MZ0302 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $251 | $226 | Not Implemented |
MZ0302 # 02 Y:2020 | 02 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,767 | $14,500 | Not Implemented |
MZ0302 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,015 | $4,700 | Implemented |
NL0053 # 01 Y:2020 | 01 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $46,240 | $187,000 | Not Implemented |
NL0053 # 02 Y:2020 | 02 | 2020 | KEEP EQUIPMENT CLEAN | $24,724 | $8,528 | Implemented |
NL0053 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,267 | $4,456 | Implemented |
NL0053 # 04 Y:2020 | 04 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,704 | $12,000 | Implemented |
NL0053 # 05 Y:2020 | 05 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,360 | $56 | Implemented |
NL0053 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,013 | $1,500 | Implemented |
NL0053 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,612 | $1,245 | Not Implemented |
NL0053 # 08 Y:2020 | 08 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,080 | $56 | Implemented |
NL0053 # 09 Y:2020 | 09 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $643 | $1,643 | Not Implemented |
NL0053 # 10 Y:2020 | 10 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $637 | $630 | Not Implemented |
MZ0293 # 09 Y:2020 | 09 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,186 | $28,360 | Not Implemented |
MZ0293 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $328,879 | $538,653 | Implemented |
MZ0293 # 07 Y:2020 | 07 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,010 | $25,500 | Not Implemented |
MZ0293 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $230 | $780 | Implemented |
MZ0293 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $63,762 | $88,053 | Implemented |
MZ0293 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,596 | $4,100 | Not Implemented |
MZ0293 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,924 | $910 | Implemented |
MZ0293 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,246 | $6,782 | Implemented |