Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,404
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0669 # 02 Y:2003 | 02 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $40,428 | $15,550 | Not Implemented |
UD0669 # 03 Y:2003 | 03 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $21,194 | $5,400 | Not Implemented |
UD0669 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,992 | $0 | Not Implemented |
UD0669 # 05 Y:2003 | 05 | 2003 | REDUCE VENTILATION AIR | $11,545 | $0 | Not Implemented |
UD0669 # 06 Y:2003 | 06 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $10,502 | $0 | Not Implemented |
UD0669 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,865 | $13,600 | Not Implemented |
UD0669 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,380 | $1,800 | Not Implemented |
UD0669 # 09 Y:2003 | 09 | 2003 | MINIMIZE WATER USAGE | $5,328 | $10,000 | Implemented |
UD0669 # 10 Y:2003 | 10 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,244 | $9,025 | Implemented |
UD0669 # 11 Y:2003 | 11 | 2003 | PURCHASE APPROPRIATELY SIZED MATERIAL | $3,800 | $0 | Implemented |
UD0669 # 12 Y:2003 | 12 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,847 | $1,754 | Not Implemented |
UD0669 # 13 Y:2003 | 13 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,888 | $6,450 | Implemented |
UD0669 # 14 Y:2003 | 14 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,679 | $142 | Implemented |
UD0669 # 15 Y:2003 | 15 | 2003 | INSTALL OCCUPANCY SENSORS | $1,622 | $177 | Not Implemented |
UD0669 # 16 Y:2003 | 16 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $568 | $1,026 | Implemented |
UD0669 # 17 Y:2003 | 17 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $350 | $1,168 | Not Implemented |
AM0438 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $12,900 | $18,200 | Implemented |
AM0438 # 02 Y:2003 | 02 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,900 | $0 | Implemented |
AM0438 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,700 | $0 | Implemented |
AM0438 # 04 Y:2003 | 04 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $2,350 | $0 | Implemented |
AM0438 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $260 | $60 | Not Implemented |
UM0230 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,775 | $18,691 | Not Implemented |
UM0230 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,479 | $300 | Not Implemented |
UM0230 # 03 Y:2003 | 03 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,163 | $4,500 | Implemented |
UM0230 # 04 Y:2003 | 04 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,688 | $8,100 | n/a |